P920 BACHELOR HEADQUARTERS
Location DJIBOUTI
Year 2014-2015
Status of the work The project had been completed and delivered in working condition in June, 2015
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of DOAS's, air conditioning units, PTAC units and domestic hot water system. The scope of the project is to produce DDC - MCC panels, mechanical installation of the field equipments, cable connections, programming of the controllers and startup the whole system.
Number of control points 1072 I/O and Bacnet integration
MOSUL 200 BED STATE HOSPITAL
Location Mosul - Iraq
Year 2014
Status of the work HVAC BMS had been comleted in May, 2014
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 20 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 890 I/O
ALKHAIRAT POWER PLANT
Location Karbala - Iraq
Year 2014
Status of the work HVAC automationsystem had been comleted in March, 2014
Work performed The HVAC Automation System had been established to control and trace the HVAC system which is consist of 11 AHU's. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 190 I/O
PRESIDENTIAL INFORMATION AND COORDINATION CENTER
Location Kabul - Afghanistan
Year 2014
Status of the work HVAC BMS had been comleted in March, 2014.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 14Rooftop Units ( RTU ). This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 140 I/O
KONYA AIRPORT
Location Konya - TURKEY
Year 2014
Status of the work HVAC BMS had been comleted in August, 2014.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 14 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 480 I/O
HOLIDAY INN HOTEL
Location Gaziantep - TURKEY
Year 2013
Status of the work HVAC BMS had been comleted in December, 2013.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 10 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. The DDC-MCC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 650 I/O
MARDIN ARTUKLU UNIVERSITY CAMPUS CONFERENCE HALL
Location Mardin - TURKEY
Year 2014
Status of the work HVAC automationsystem had been comleted in September, 2014.
Work performed The HVAC Automation System had been established to control and trace the HVAC system which is consist of 6 AHU's. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 150 I/O
TURKISH EMBASSY BUILDING
Location Naxcivan - NAXCIVAN
Year 2013
Status of the work HVAC BMS had been comleted in November, 2013.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 5 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system, VRV system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers, Bacnet integration for VRV and startup is made by us.
Number of control points 1400 I/O
RADIOTHERAPY HOSPITAL
Location Basrah - Iraq
Year 2013
Status of the work HVAC BMS and Bulding Security Management had been comleted in November, 2013.
Work performed The Building Management System had been integrated with the building weak current system which is consist of CCTV, access control, fire alarm system, public address and voice alarm, tv system, IP phone system. The Integrated Building Management System is established to control and trace the HVAC system which is consist of 2 AHU, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers, Bacnet integration for weak current system and startup is made by us.
Number of control points 250 I/O
RADIOTHERAPY HOSPITAL
Location Hillah - Iraq
Year 2013
Status of the work HVAC BMS and Bulding Security Management had been comleted in November, 2013.
Work performed The Building Management System had been integrated with the building weak current system which is consist of CCTV, access control, fire alarm system, public address and voice alarm, tv system, IP phone system. The Integrated Building Management System is established to control and trace the HVAC system which is consist of 2 AHU, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers, Bacnet integration for weak current system and startup is made by us.
Number of control points 250 I/O
RADIOTHERAPY HOSPITAL
Location Ramadi - Iraq
Year 2013
Status of the work HVAC BMS and Bulding Security Management had been comleted in November, 2013.
Work performed The Building Management System had been integrated with the building weak current system which is consist of CCTV, access control, fire alarm system, public address and voice alarm, tv system, IP phone system. The Integrated Building Management System is established to control and trace the HVAC system which is consist of 2 AHU, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers, Bacnet integration for weak current system and startup is made by us.
Number of control points 250 I/O
TITANIC OTEL
Location Sulaymaniyah - Iraq
Year 2011-2013
Status of the work HVAC BMS had been comleted in August, 2013.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 18 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. The DDC-MCC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 370 I/O
400 BED STATE HOSPITAL
Location Adana - TURKEY
Year 2011-2012
Status of the work HVAC BMS had been comleted in August, 2011.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 34 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 1600 I/O
ERDOBA ELEGANCE 5 STARS HOTEL
Location Mardin - TURKEY
Year 2011
Status of the work HVAC BMS had been comleted in 2011.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 17 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 625 I/O
SAID HAMDINE LAW FACULTY
Location Algeria
Year 2013
Status of the work HVAC BMS had been comleted in December, 2013.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 34 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup made by us.
Number of control points 1100 I/O
MEDLINE HOSPITAL
Location Adana - TURKEY
Year 2009
Status of the work HVAC BMS had been comleted in 2009.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of 22 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 700 I/O
CUKUROVA UNIVERSITY BALCALI HOSPITAL EMERGENCY DEPT.
Location Adana - TURKEY
Year 2011
Status of the work HVAC Automation had been comleted in 2011.
Work performed The Automation system had been established to control and trace the AHU's . The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 150 I/O
HILLAH 400 BED STATE HOSPITAL
Location Hillah - Iraq
Year 2014-2015
Status of the work The project was started in January, 2014 and completed in 2015. Type of work: Supervision for BMS and low current systems, programming and commissioning of the systems.
Work performed
Number of control points 3200 I/O
MERSIN CENTRAL BUS STATION
Location Mersin - TURKEY
Year 2015
Status of the work Fire Alarm System and HVAC Automation is comleted in March, 2015.
Work performed The terminal building is equipped with the smoke evacuation windows. The main purpose of the automation system is to provide open the smoke evacuation windows automatically when a fire alarm is active. The BMS is established to trace the fire fighting system pumps and butterfly valves and water tank level etc. If a fire alarm is activated the BMS will sent SMS to inform the City Fire Protection Department
Number of control points 105 I/O
HATEM HOSPITAL
Location Gaziantep - TURKEY
Year 2015
Status of the work The project is started in January, 2015 and completed in June, 2015.
Work performed The Building Management System is established to control and trace the HVAC system which is consist of 13 AHU's, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and chilled water system and other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The scope of the project is to produce DDC-MCC panels, mechanical installation of the field equipments, cable connections, programming of the controllers and startup the whole system.
Number of control points 676 I/O and Bacnet MS/TP integration points.
KILIS STATE HOSPITAL
Location Kilis - TURKEY
Year 2015
Status of the work HVAC BMS is comleted in March, 2015.
Work performed The Building Management System is established to control and trace the HVAC system which is consist of 7 AHU's, hot water boilers and hot water circulation pumps. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us
Number of control points 200 I/O
CARREFOUR SHOPPING MALL
Location DUHOK - IRAQ
Year 2014
Status of the work The project is completed and delivered in working condition in June, 2015
Work performed The Building Management System is established to control and trace the HVAC system which is consist of AHUs, fan coil units ant the other HVAC units. This BMS was carried out by Johnson Controls field equipments and controllers and Metasys software. The scope of the project is to produce DDC panels, mechanical installation of the field equipments, cable connections, programming of the controllers and startup the whole system.
Number of control points 800 I/O
COMPOUND REHAB NIAMEY
Location Niamey, NIGER
Year 2014-2015
Status of the work The project is completed and delivered in working condition in May, 2015
Work performed The Building Management System is established to control and trace the HVAC system which is consist of AHUs, chillers and chilled water pumps,ventilation units and generator fuel system. The scope of the project is to produce DDC panels, mechanical installation of the field equipments, cable connections, programming of the controllers and
Number of control points 350 I/O and Modbus integration
NEOPLIS HOTEL
Location AYAS-MERSIN
Year 2015
Status of the work The project is completed in Jun, 2016
Work performed The Building Management System established to control and trace the HVAC system which is consist of AHUs, water source heat pumps and hot water circulation pumps, VRF system and the other mechanical equipments. Scope of the work is The DDC-MCC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers, VRF integrations and startup the whole system via the BMS.
Number of control points 2.410 I/O and Bacnet integration points.
AGHTIA ALPIN NATUREL SPRING WATER
Location POZANTI - ADANA / TURKEY
Year 2015
Status of the work The project is started in June, 2015 and completed at the end of 2015
Work performed BMS: The Building Management System had been established to control and trace the HVAC system which is consist of AHUs, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and the other mechanical equipments. This BMS will be carried out by Johnson Controls field equipments and controllers and software. DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us. SECURITY SYSTEM: Closed Circuit Television System - CCTV Public Address and Voice Alarm System Fire Alarm System had been installed and startup by us.
Number of control points 150 I/O points and Bacnet MS/TP integration points.
MAJIDIMALL SHOPPING MALL
Location Suleimania - N. Iraq
Year 2015-2016
Status of the work The project is signed in September, 2015 and completed in 1st quarter of 2016.
Work performed BMS: The Building Management System will be established to control and trace the HVAC system which is consist of AHUs, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and the other mechanical equipments. This BMS carried out by Johnson Controls field equipments and controllers and software. DDC panel production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 1.355 IO points
PRIVATE DEFALIFE HOSPITAL
Location GAZIANTEP - TURKEY
Year 2015-2016
Status of the work DDC-MCC panels have been delivered to the site,
Mechanical installation works and cable end termination works for the field instruments are completed.
BMS has been delivered to the customer in 2016.
Work performed DDC panels production MCC panels production Mechanical installation and cable end terminations for the field instruments. All the engineering works included project, programming the controllers, designing the BMS HMI, test and start up and training.
Number of control points
PRIVATE SEZAR HOSPITAL
Location ADANA - TURKEY
Year 2016
Status of the work The BMS has been completed and delivered to the customer in 2016.
Work performed The Building Management System will be established to control and trace the HVAC system which is consist of AHUs, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and the other mechanical equipments. This BMS will be carried out by Johnson Controls field equipments and controllers and software. DDC - MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
Number of control points
BESMAYA ELECTRICAL POWER PLANT
Location BAGHDAD - IRAQ
Year 2016-2017
Status of the work HVAC BMS had been comleted in November, 2017.
Work performed Documentation, DDC and MCC panel production with Factory Acceptance Test, Programming the controllers and BMS HMI, and startup the HVAC system via BMS, Site Acceptance Test, Verification process for HVAC field instruments, Training for users,
Number of control points 2.600 IO and Bacnet Integrations
PRIVATE AKADEMI HOSPITAL
Location GAZIANTEP - TURKEY
Year 2016
Status of the work The BMS has been completed in 2016.
Work performed The Building Management System will be established to control and trace the HVAC system which is consist of AHUs, hot water boilers and hot water circulation pumps, chillers and chilled water pumps and the other mechanical equipments. This BMS will be carried out by Johnson Controls field equipments and controllers and software. DDC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
Number of control points
SARAYHAN THERMAL HOTEL / D BLOCK
Location CIFTEHAN / NIGDE - TURKEY
Year 2016-2017
Status of the work The DDC and the MCC panels and the field equipments have been delivered to the site, cable terminations, programming and commissioning are completed. The project is complete at the end of year 2017.
Work performed The Building Management System is being established to control and trace the HVAC system which is consist of AHUs, and the other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and software. DDC and MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
Number of control points 300 IO points
PRIVATE ORTADOGU HOSPITAL ADDITIONAL FACILITY BUILDING
Location MERSIN - TURKEY
Year 2016-2017
Status of the work the BMS has been completed and delivered to the customer in 2016.
Work performed Manufacturing the DDC and MCC panels
Preparing the cabling projects,
Mechanical installation for the field instruments, Cable end terminations, Programming and start up the HVAC BMS
Number of control points 300 IO points.
PRIVATE ALTINKOZA HOSPITAL BUILDING
Location YUREGIR / ADANA - TURKEY
Year 2016
Status of the work The project has been completed at the end of 2017.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of AHUs, exhaust fans, operation theaters and the other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and software. DDC-MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup is made by us.
Number of control points 450 IO points
SCIENCE AND TECHNOLOGY UNIVERSITY - BTU
Location ADANA - TURKEY
Year 2018
Status of the work Three of the buildings are in our scope :
Engineering Faculty Building
Administratin Building ( Rectorate Building )
Dining Hall Building

HVAC BMS had been comleted in March, 2018.
Work performed The Building Management System had been established to control and trace the HVAC system which is consist of AHUs, Heat Recovery Units, Rooftop Unit and the other HVAC mechanical equipments. The BMS was carried out by Johnson Controls field equipments and controllers and software. DDC and MCC panels production, mechanical installation of the field equipments, cabling and cable connections, programming of the controllers and startup were made by us.
Number of control points 1.350 IO points and Bacnet integration points.