PRIVATE BOSSAN ( GAZIKENT ) HOSPITAL
Location GAZIANTEP
Year 2018
Status of the work The DDC and the MCC panels are being produced and planned to deliver them to site at the end of Jun 2018.
Work performed Manufacturing the DDC and MCC panels
Preparing the cabling projects,
Mechanical installation for the field instruments, Cable end terminations, Programming and start up the HVAC BMS
Number of control points 1.400 IO points ve 3.900 Integration points.
TEIAS 12TH REGION ADMINISTRATION BUILDING
Location GAZIANTEP
Year 2018
Status of the work The DDC panel projects and cabling projects are being prepared.
Work performed
Number of control points 294 IO points ve 1.605 Integration points.
HILTON HOTEL
Location ISKENDERUN
Year 2018
Status of the work The DDC panels and field instruments had been delivered to site. Startup and commissioning will be made after the cabling is completed.
Work performed Documentation, DDC panel production, Programming the controllers and BMS HMI, and startup the HVAC system via BMS, Training for users,
Number of control points 480 IO points and 2.400 Bacnet integration points
SOUTH CAUCASUS PIPELINE EXPANSION PROJECT
Location TBILISI, GEORGIA
Year 2017
Status of the work The DDC panel had been delivered to site. Startup and commissioning will be made after the cabling is completed.
Work performed Documentation, DDC panel production, Programming the controllers and BMS HMI, and startup the HVAC system via BMS, Training for users,
Number of control points 200 IO points and Bacnet integration
SARAYHAN TERMAL OTEL / A BLOCK
Location CIFTEHAN / NIGDE
Year 2017
Status of the work The DDC and the MCC panel are producing and planned to deliver them to site at the end of March 2018.
Work performed The Building Management System is being established to control and trace the HVAC system which is consist of AHUs, and the other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and software. DDC and MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
Number of control points 1000 IO points
SARAYHAN TERMAL OTEL / F BLOCK
Location CIFTEHAN / NIGDE
Year 2017
Status of the work The DDC and the MCC panel are producing and planned to deliver them to site at the end of Jan 2018.
Work performed The Building Management System is being established to control and trace the HVAC system which is consist of AHUs, and the other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and software. DDC and MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
Number of control points 250 IO points
ZUBAIR - HV POWER TRANSMISSION
Location BASRA - IRAQ
Year 2016
Status of the work DDC panels are producing now,
The cabling projects and programming the controllers are nearly completed.
DDC Panels will be delivered after completing the production
Work performed The HVAC BMS are being installed for the Control Buildings on the High Voltage Transmission Line by our company.
Scope of work;
DDC panels production
Engiineering works included cabling projects and programming the controllers, preparing the user HMI graphics, test and commissioning the automation system and training.
Number of control points