PRIVATE BOSSAN ( GAZIKENT ) HOSPITAL
الموقع GAZIANTEP
العام 2018
حالة العمل The DDC and the MCC panels are being produced and planned to deliver them to site at the end of Jun 2018.
العمل المنفذ Manufacturing the DDC and MCC panels
Preparing the cabling projects,
Mechanical installation for the field instruments, Cable end terminations, Programming and start up the HVAC BMS
عدد نقاط التحكم 1.400 IO points ve 3.900 Integration points.
TEIAS 12TH REGION ADMINISTRATION BUILDING
الموقع GAZIANTEP
العام 2018
حالة العمل The DDC panel projects and cabling projects are being prepared.
العمل المنفذ
عدد نقاط التحكم 294 IO points ve 1.605 Integration points.
HILTON HOTEL
الموقع ISKENDERUN
العام 2018
حالة العمل The DDC panels and field instruments had been delivered to site. Startup and commissioning will be made after the cabling is completed.
العمل المنفذ Documentation, DDC panel production, Programming the controllers and BMS HMI, and startup the HVAC system via BMS, Training for users,
عدد نقاط التحكم 480 IO points and 2.400 Bacnet integration points
SOUTH CAUCASUS PIPELINE EXPANSION PROJECT
الموقع TBILISI, GEORGIA
العام 2017
حالة العمل The DDC panel had been delivered to site. Startup and commissioning will be made after the cabling is completed.
العمل المنفذ Documentation, DDC panel production, Programming the controllers and BMS HMI, and startup the HVAC system via BMS, Training for users,
عدد نقاط التحكم 200 IO points and Bacnet integration
SARAYHAN TERMAL OTEL / A BLOCK
الموقع CIFTEHAN / NIGDE
العام 2017
حالة العمل The DDC and the MCC panel are producing and planned to deliver them to site at the end of March 2018.
العمل المنفذ The Building Management System is being established to control and trace the HVAC system which is consist of AHUs, and the other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and software. DDC and MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
عدد نقاط التحكم 1000 IO points
SARAYHAN TERMAL OTEL / F BLOCK
الموقع CIFTEHAN / NIGDE
العام 2017
حالة العمل The DDC and the MCC panel are producing and planned to deliver them to site at the end of Jan 2018.
العمل المنفذ The Building Management System is being established to control and trace the HVAC system which is consist of AHUs, and the other mechanical equipments. This BMS was carried out by Johnson Controls field equipments and controllers and software. DDC and MCC panels production, mechanical installation of the field equipments, cable connections, programming of the controllers and startup has been made by us.
عدد نقاط التحكم 250 IO points
ZUBAIR - HV POWER TRANSMISSION
الموقع BASRA - IRAQ
العام 2016
حالة العمل DDC panels are producing now,
The cabling projects and programming the controllers are nearly completed.
DDC Panels will be delivered after completing the production
العمل المنفذ The HVAC BMS are being installed for the Control Buildings on the High Voltage Transmission Line by our company.
Scope of work;
DDC panels production
Engiineering works included cabling projects and programming the controllers, preparing the user HMI graphics, test and commissioning the automation system and training.
عدد نقاط التحكم